New facility onboarding in 14 days
Stand up a new warehouse in PestMetry — from blueprint digitization to first inspection — without slowing down operations.
- 01
Day 1–2 · Facility profile & team setup
Create the facility, invite the on-site team, assign roles, and configure time zones, shifts, and notification defaults so alerts route to the right people from day one.
- 02
Day 3–5 · Blueprint digitization
Upload the current facility blueprint (PDF, DWG, or photo). Use the digitization workflow to produce a clean, high-resolution base map with racks, docks, restrooms, and sanitation zones labeled.
- 03
Day 6–8 · Mapping & pick-slot layout
Draw zones, aisles, and pick slots on the digital map. Import slot IDs from your WMS export or use the built-in slot numbering assistant to generate consistent labels.
- 04
Day 9–11 · Devices, tools & baseline inspection
Place traps, monitoring devices, and control stations on the map. Run a baseline inspection so the facility has a documented starting condition before day-to-day activity begins.
- 05
Day 12–14 · Go-live & handoff
Turn on scheduled inspections, sanitation tasks, and reporting. Walk the team through the Getting Started checklist and confirm the first weekly report generates cleanly.
